| Renovation of 13,000 m of drinking water pipes |
| Building complex consisting of 4 components (approx. 5,000 m² gross floor area) |
| Separation of the extinguishing water system from the drinking water |
| Refurbishment of over 1000 taps and two drinking water heaters with a total output of 840 kW |
| Replacement of all emergency showers in the L-building (80 units) |
| Renovation of the cooling pipes for the server room with approx. 250 m of pipework |
| Renovation of the ventilation system with 250 fire dampers and connection to the BMS |
| Fire protection refurbishment of existing pipework (heating, compressed air, vacuum, demineralised water and non-combustible technical gases) |