New construction of Schierker Feuerstein Arena

Customer | Client

Wernigerode Cultural Foundation

Order

HOAI Phases 2 to 8
Services sanitary, heating, ventilation, cooling, I&C and electrical engineering, low-current and utilization-specific systems, safety lighting and sound systems

Details

KGR 400 approx. 1,410,000 € net
Planning 10/2013 to 08/2015
Execution 06/2016 to 12/2017

Development and planning

Multifunctional event area >2,200 m² Catering: 312 m², technical building: 312 m²
Outdoor ice paving area >1,500 m², cooling capacity 400 kW
Scene lighting LED/DALI
Installation of medium and low-voltage power supply
Sound system for the event area with an installed output of 5kW with ENS in accordance with DIN EN 0828
Installation of safety lighting inside and outside the buildings
Planning and construction supervision of MEPC and electrical trades
Construction of 2 functional buildings and the catering area
Installation of the lightning protection system for the building sections

www.schierker-feuerstein-arena.de